| Town Roads Leh G1-Lot-01 (Leh Main, Shenam-Sheldon, Upper Tuckcha-Changespa) |
| Improvement by way of Strengthening upto WBM Level of Following: Town Roads Leh Lot-01 (Leh Main, Shenam-Sheldon, Upper Tuckcha-Changespa, Lamdon-Lebok (3.2 KM) |
Loan:
|
2151-IND |
| Category: |
Engineers Design |
| Location: |
Kashmir Transport Roads |
| Districts Passing: |
|
Constituency Passing: |
|
| Status: |
Works Completed |
| ERA Ref: |
Transport Srinagar/Roads/32 Lot 1 Type:Works Mode: LCB |
| ERA Pac ID: |
0073.1 |
| PCSS No: |
0088 |
| Scope of Work: |
4.298 KM |
| Contract Cost in Rs crore: |
2.71 |
| Dynamic Cost in Rs crore: |
2.71 |
| Contractor Details |
Dorjey Tonyot (JV) |
| Date of Signing of Contract |
10 October 2008 |
| Date of Start of Work (NTP) |
08 November 2008 |
| Completion Period |
(12 Months) |
| Completion Date as per Contract |
08 November 2009 |
|
|
| |
Project completed and handed over to PWD (R&B) Deptt Leh
|
| Project completed and handed over to PWD (R&B) Deptt Leh
|
| |