Loan:
|
2151-IND |
| Category: |
Engineers Design |
| Location: |
Kashmir Transport Roads |
| Districts Passing: |
|
Constituency Passing: |
|
| Status: |
Works Completed |
| ERA Ref: |
Transport Srinagar/Roads/33-Lot-2 Type:Works Mode: LCB |
| ERA Pac ID: |
0073.5 |
| PCSS No: |
0102 |
| Scope of Work: |
3.340 KM |
| Contract Cost in Rs crore: |
2.3548 |
| Dynamic Cost in Rs crore: |
2.35 |
| Contractor Details |
Mohd Sultan and Brothers |
| Date of Signing of Contract |
20 April 2009 |
| Date of Start of Work (NTP) |
18 May 2009 |
| Completion Period |
(12 Months) |
| Completion Date as per Contract |
22 April 2010 |