Wanpoh-Chawalgam-Aharbal Road
|
|
Dated: 08 January 2010
|
|
Black topped road in Section-II.
|
|
|
|
Black topped road in Section-II and Retaining wall along road in Tchawalgam Aharbal Section
|
|
|
|
Dated: 08 January 2010
|
|
Black topped road in Section-I.
|
|
|
|
Black topped road in Section-I. and Upgraded market road
|
|
|
|
Dated: 08 January 2010
|
|
2-RawalPoraTengpora(P2)8-Jan-2010.jpg
|
|
|
|
2-RawalPoraTengpora(P2)8-Jan-2010.jpg and Road restored in SEC-3 in lane 23-25-26.
|
|
|
|
Dated: 08 January 2010
|
|
Perfocated in Manhole cover for water.
|
|
|
|
Pefocation in Manhole cover for water percolation. and Reinforcement mesh for bottom plug of sump
|
|
|
|
Dated: 08 January 2010
|
|
Excavation in Main drain
|
|
|
|
Excavation in Main drain and Road Restoration by metalling.
|
|
|
|
Dated: 08 January 2010
|
|
Top View of RCC main drain Trapezoidal in section.
|
|
|
|
|
|
|
|
Dated: 08 January 2010
|
|
Widening of road
|
|
|
|
Widening of road in Tchawalgam Aharbal Section. Retaining wall along road in Tchawalgam Aharbal Section.
|
|
|
|
Dated: 01 January 2010
|
|
Intake Boria Project
|
|
|
|
Intake bohria completed by J&K ERA and commissioned on
|
|
|
|
Dated: 30 November 2009
|
|
Sofshali Bridge
|
|
|
|
Sofshali Bridge
|
|
|
|
Dated: 30 October 2009
|
|
Natipora-Nowgam-Newa Road
|
|
|
|
23.79 Km road completed and handed ovet to R&B Deptt
|
|
|