Loan 2151-IND

Multisector Project for Infrastructure Rehabilitation in J&K (MPIR)

ADB Loan 2151-IND


 
SNo Sub Project Region Sector Scope Cost (INR crore) Award Date Completion Date Status
1 Teilbal Bridge Kashmir Transport 26 Mts 1.17 02 February 2006 30 December 2007 Works Completed
2 Kani-Kadal Bridge Kashmir Transport 32 Mts 1.54 02 February 2006 30 October 2007 Works Completed
3 Gundtal Dara Bridge Kashmir Transport 18 Mts 0.56 02 February 2006 30 October 2007 Works Completed
4 Naraspora-Budgam Bridge Kashmir Transport 22 Mts 1.31 17 February 2006 31 October 2007 Works Completed
5 Laktipora Bridge Kashmir Transport 18 Mts 1.20 17 February 2006 30 October 2007 Works Completed
6 Town-Hall Budgam Bridge Kashmir Transport 26 Mts 2.10 17 February 2006 31 October 2007 Works Completed
7 Kaghote Nallah Bridge Jammu Transport 47 Mt 3.63 28 February 2006 29 March 2008 Works Completed
8 Kooh Nallah Bridge Jammu Transport 45 Mt 4.01 28 February 2006 31 March 2008 Works Completed
9 Water Tankers Jammu Jammu Urban 9 kl - 15nos4 kl - 6 nos 2.00 13 April 2006 12 October 2006 Works Completed
10 Devak Nallah Bridge Jammu Transport 136.28 Mt 2.99 28 April 2006 27 October 2007 Works Completed
11 Rangil Water Supply Kashmir Urban 700-150 mm dia 51.45 Km 30.65 10 May 2006 30 November 2007 Works Completed
12 22 Tube Wells Jammu Urban Tubewells-22 11.45 24 June 2006 22 July 2007 Works Completed
13 Strengthening of Existing System Rising Mains (Phase-I) Jammu Urban 600-100 dia 60 km 24.36 14 September 2006 28 March 2008 Works Completed
14 Talab Tillo Area Drain Jammu Urban 13 Km 23.16 18 September 2006 28 September 2008 Works Completed
15 Public Toilet Jammu Jammu Urban 25 nos 2.47 18 September 2006 24 September 2007 Works Completed
16 Lethpora-Penthachowk Road Kashmir Transport 38.5 Km 34.81 13 October 2006 23 November 2008 Works Completed
17 Sangrama-Sopore-Kulangam Road Kashmir Transport 27.3 Km 38.32 26 October 2006 21 December 2008 Works Completed
18 Humhama-Budgam and Raithon-Arizal Road Kashmir Transport 37.6 Km 36.32 27 October 2006 24 December 2008 Works Completed
19 Sidhra-Surinsar-Mansar Road Jammu Transport 38.50 Km 60.76 18 December 2006 17 December 2008 Works Completed
20 Udhampur-Ramnagar Road Jammu Transport 27.73 KM 39.58 18 December 2006 17 December 2008 Works Allotted
21 Chenani-Sudh Mahadev Road Jammu Transport 30.90 KM 26.05 18 December 2006 17 December 2008 Works Completed
22 Potkhah-Pachar Road Kashmir Transport 15.74 Km 15.65 26 December 2006 21 August 2008 Works Completed
23 Strengthening of Existing System Rising Mains (Phase-II) Jammu Urban 250-100 dia 25 km 4.29 10 February 2007 21 May 2008 Works Completed
24 Akhnoor Road Upstream Drain Jammu Urban 20 KM 31.42 02 March 2007 07 March 2009 Works Completed
25 Landoichoi Primary Drain Jammu Urban 6 Km 23.31 02 March 2007 07 September 2008 Works Completed
26 Baribrahmana-Bishnah Road Jammu Transport 6.5 Km 7.85 12 April 2007 11 April 2008 Works Completed
27 PublicToilets Srinagar Kashmir Urban 12 No (Toilet Blocks) 2.26 16 April 2007 17 January 2008 Works Completed
28 Natipora-Nowgam and Newa-Pulwama Road Kashmir Transport 23.79 Km 27.27 15 May 2007 10 July 2009 Works Completed
29 Yarbugh Bridge Kashmir Transport 37 Mts 2.03 14 June 2007 13 June 2009 Works Completed
30 Sail-Pulwama Bridge Kashmir Transport 22Mts 1.08 14 June 2007 13 June 2009 Works Completed
31 Sumbal-Markundal Road Kashmir Transport 15.63 Km 10.21 20 June 2007 13 February 2009 Works Completed
32 Nishat-DoodhGanga WaterSupply Kashmir Urban 900 To 200 mm dia TL=23.38 Km 26.03 09 July 2007 17 October 2008 Works Completed
33 Watergram-Behrampora Road Kashmir Transport 20.13 Km 15.28 30 July 2007 21 February 2009 Works Completed
34 Soaf-Shali Bridge Kashmir Transport 120 mts 5.16 31 July 2007 26 September 2008 Works Completed
35 Rawalpora-Tengpora Drain Kashmir Urban 24.84 KM 73.56 10 August 2007 22 February 2009 Works Completed
36 Singhpora Kanihama Road Kashmir Transport 6.63 Km 7.80 20 August 2007 15 April 2009 Works Completed
37 Nishat-DalBund WaterSupply Kashmir Urban 750 to 350 mm dia TL=12.49 Km 17.74 22 October 2007 03 May 2009 Works Completed
38 WTP-Pumping Stations Srinagar Kashmir Urban 5 existing WTPS 20.94 30 October 2007 02 May 2009 Works Completed
39 Bijbehara Langanbal Road Kashmir Transport 29 Km 41.77 05 November 2007 30 March 2010 Works Completed
40 Doda-Bharath Road Jammu Transport 20.5 Km 23.42 16 November 2007 15 November 2009 Works Completed
41 GD Cleaning Equipment JK GROUP-3 (Lot 1) Jammu Urban 16 1.34 17 November 2007 29 June 2008 Works Completed
42 GD Cleaning Equipment JK GROUP-3 (Lot 2) Jammu Urban 2 0.09 20 November 2007 25 June 2008 Works Completed
43 Dachinpora Bridge Kashmir Transport 50 Mts 3.27 21 November 2007 15 March 2009 Works Completed
44 GD Cleaning Equipment JK GROUP-1 (Lot 1) Jammu Urban 7 0.75 21 November 2007 02 April 2008 Works Completed
45 OverHead Tanks Jammu West (Lot 3) Jammu Urban 8 OHT 4 GLSR 10.38 21 November 2007 04 June 2009 Works Completed
46 Strengthening of Existing System Rising Mains (Phase-III) Jammu Urban 89 Km 52.14 27 November 2007 06 June 2009 Works Completed
47 Papchan Bridge Kashmir Transport 52.60 Mts 4.55 04 December 2007 08 March 2009 Works Completed
48 OverHead Tanks Jammu West (Lot 1) Jammu Urban 6 OHT 3 GLSR 7.40 10 December 2007 23 June 2009 Works Completed
49 OverHead Tanks Jammu East (Lot 2) Jammu Urban 9 OHT 4 GLSR 12.34 10 December 2007 23 June 2009 Works Completed
50 Sonwani Bridge Kashmir Transport 90 Mts 5.32 18 December 2007 05 May 2009 Works Completed
51 Intake Boria Tanks Jammu East (Lot 1) Jammu Urban 1.8 MGD Intake 7.43 19 December 2007 01 July 2009 Works Completed
52 Pohru Chowk-Chanapora Drain Kashmir Urban 18 Km 44.86 26 December 2007 10 July 2009 Works Completed
53 OverHead Tanks Jammu West (Lot 2) Jammu Urban 6 OHT 3 GLSR 8.21 29 December 2007 07 July 2009 Works Completed
54 BeminaChowk-Parimpora FruitMandi Drain Kashmir Urban 12.80 Km 27.17 29 December 2007 11 July 2009 Works Completed
55 30 Tube Wells West Jammu Qty(10)(Lot 1) Jammu Urban 10 Nos 6.56 04 January 2008 11 April 2009 Works Completed
56 30 Tube Wells West Jammu Qty(10)(Lot 3) Jammu Urban 10 Nos 6.60 04 January 2008 01 April 2009 Works Completed
57 30 Tube Wells West Jammu Qty(10)(Lot 2) Jammu Urban 10 Nos 6.84 04 January 2008 11 April 2009 Works Completed
58 Wanpoh-Chawalgam-Aharbal Road Kashmir Transport 42.7 KM 41.14 07 January 2008 30 December 2009 Works Completed
59 30 Tube Wells West Jammu Civil Work Qty(30)(Lot 4) Jammu Urban 30 Tubewell Buildings 2.80 07 January 2008 07 July 2009 Works Completed
60 Drabshalla-Bimalnag Road Jammu Transport 8.3 Km 12.03 12 February 2008 11 February 2010 Works Completed
61 Replacement of Worn out Pipes Distribution System (Phase I) Jammu Urban 86 Km 33.80 15 February 2008 21 August 2009 Works Allotted
62 OverHead Tanks Jammu East (Lot 3) Jammu Urban 12 OHT 4 GLSR 11.26 15 February 2008 22 August 2009 Works Allotted
63 Wahibugh Bridge Kashmir Transport 95 Mts 3.99 15 March 2008 13 July 2009 Works Completed
64 Handwara Zachaldara Waddur Road Kashmir Transport 17 Km 31.35 31 March 2008 08 November 2009 Works Completed
65 Kralgund-Ashpora-Qaziabad Road Kashmir Transport 13.53 Km 21.43 31 March 2008 08 November 2009 Works Completed
66 Chanpora-Kunzer Bridge Kashmir Transport 54 Mts 2.12 09 April 2008 06 August 2009 Works Allotted
67 Bonchak Bridge Kashmir Transport 60 Mts 1.00 09 April 2008 30 August 2009 Works Completed
68 Kali Bari Kathua-Hatli Morh Road Jammu Transport 6.57 KM 22.61 09 April 2008 07 May 2010 Works Completed
69 Town Roads Kargil - Lot2 (G.M Pora,Trespone link roads ) Kashmir Transport 5.70 KM 3.68 24 April 2008 12 February 2009 Works Completed
70 Replacement of Worn out Pipes Distribution System (Phase II) Jammu Urban 83 Km 33.68 25 April 2008 08 November 2009 Works Completed
71 Town Roads Kargil - Lot1 (Circular road,Goma Kargil) Kashmir Transport 5 KM 5.01 02 May 2008 01 March 2009 Works Completed
72 Town Roads Kargil - G4-Lot2 B.M(Circular road, Goma Kargil) Kashmir Transport 3.60 KM 1.80 02 May 2008 01 March 2009 Works Completed
73 Tokina Bridge Kashmir Transport 120 Mts 13.11 29 May 2008 28 November 2009 Works Completed
74 Natipora-Chadoora-ChariSharief Road Kashmir Transport 24 Km 37.50 23 June 2008 21 July 2010 Works Completed
75 Town Roads Leh G1-Lot-01 (Leh Main, Shenam-Sheldon, Upper Tuckcha-Changespa) Kashmir Transport 4.28 KM 2.71 10 October 2008 08 November 2009 Works Completed
76 Town Roads Leh G1-Lot-2 (Tukcha, Skampari Colony) Kashmir Transport 5.5 KM 2.92 03 November 2008 30 November 2009 Works Completed
77 Town Roads Leh G2-Lot-1 (Tyari Rong- Jiva Tsal Road-RD0Km-RD3.6K) Kashmir Transport 3.60 KM 2.67 03 November 2008 30 November 2009 Works Completed
78 Habdipora-Qadar-Qaimoh Road Kashmir Transport 24 Km 52.59 08 November 2008 05 September 2010 Works Completed
79 Sopore-Bandipora Road Kashmir Transport 30.87 Km 38.54 22 November 2008 19 December 2010 Works Completed
80 Saidpura Bridge Kashmir Transport 37 Mts 5.37 06 December 2008 03 January 2010 Works Completed
81 Redevelopment of Existing TubeWells (Lot 1) Jammu Urban 38 Nos 0.74 30 January 2009 29 May 2010 Works Completed
82 Garbage Drain Cleaning Equipment Jammu and Kashmir WaterTankers Lot-2 Jammu Urban 4 KL 5Nos. 0.52 24 March 2009 14 July 2009 Works Completed
83 Garbage Drain Cleaning Equipment Jammu and Kashmir WaterTankers Lot-1 Jammu Urban 9KL -09 Nos 1.07 24 March 2009 14 July 2009 Works Completed
84 Town Roads Leh G2-Lot-2 (Tyari Rong- Jiva Tsal Road RD3.60Km-RD7.20Km) Kashmir Transport 3.60 KM 2.35 20 April 2009 22 April 2009 Works Completed
85 GD Cleaning Equipment JK (Skid Loader) GROUP-1(Lot 2B) Jammu Urban 1 No 0.81 28 April 2009 17 August 2009 Works Completed
86 GD Cleaning Equipment JK (Back Hoe Loader Cum Excavator) GROUP-1(Lot 2A) Jammu Urban 2 Nos 0.84 29 April 2009 17 August 2009 Works Completed
87 Shahdara-KamalKote Road Kashmir Transport 15.50 Km 21.71 01 May 2009 04 May 2011 Works Completed
88 Town Roads Leh G4-Lot-02 (Tyari Rong- Jiva Tsal Road) Bituminisation Kashmir Transport 3.60 KM + 3.60 KM 2.77 13 August 2009 Works Completed
89 GD Cleaning Equipment JK GROUP-2 Jammu Urban 10 Dumper Placer 175 Garbage Container 1.63 19 December 2009 08 July 2010 Works Completed
90 GD Cleaning Equipment JK GROUP-1 (Lot 3B) Jammu Urban 10 Nos 1.36 15 January 2010 04 May 2010 Works Completed
91 GD Cleaning Equipment JK GROUP-1 (Lot 3A) Jammu Urban 6 Nos 0.52 15 January 2010 04 May 2010 Works Completed
92 Construction of 6 Tube Wells Lot-01 Jammu Urban 6 Nos 4.43 18 January 2010 11 February 2011 Works Completed
93 TR Leh G4-Lot-01Bituminisation (Leh Main, Shenam-Sheldon, Upper Tuckcha-Changespa) Kashmir Transport 8.87 KM 2.43 23 January 2010 23 February 2010 Works Completed
94 Town Roads Kargil - G4-Lot1 B.M (G.M Pora,Trespone link Roads) Kashmir Transport 3.60 KM 1.66 23 January 2010 23 August 2011 Works Completed
95 Singhpora Kanihama Road-KanihamaBridge-Lot-1 Kashmir Transport Span 1x 24 Mts 2.20 26 February 2010 24 March 2011 Works Completed
96 Bijbehara Langanbal Road Kirkadal-Lot-1 Kashmir Transport Span 21 mts 2.89 03 April 2010 29 April 2011 Works Completed
97 Civil Works for 6 Tube Wells Lot-02 Jammu Urban 6 Nos 0.64 10 May 2010 31 May 2011 Works Completed
98 Electromechanical Equipment Jammu Jammu Urban 44 Horizontal-Centraifugal Pumps 30 Panels 2KM XLP 7.98 28 October 2010 19 August 2011 Works Completed
99 33/11KV Feeder-(VCB Panels) Lot-2 Jammu Urban Panels:70 TF:57 2.98 16 November 2010 08 June 2011 Works Completed
100 33/11KV Feeder-(Aluminum Conductor)-Lot-3 Jammu Urban Cable:432KM Wire:60 Tons 1.48 16 November 2010 08 June 2011 Works Completed
101 33/11KV Feeder-(Power Transformers) Lot-1 Jammu Urban PT=7 DT=10 3.89 06 December 2010 15 June 2011 Works Completed
102 33/11KV Feeder-(XLPE Cables)-Lot-5 Jammu Urban Cable:23KM 2.76 06 December 2010 15 June 2011 Works Completed
103 33/11KV Feeder-(Steel Tubular Poles)-Lot-6 Jammu Urban Poles: 3818 Nos 4.45 09 December 2010 15 June 2011 Works Completed
104 33/11KV Feeder-(Insulators,Isolators,L-Arrestor)-Lot-4 Jammu Urban Insulator:15735 Nos Isolator:148 Nos 1.24 18 December 2010 17 June 2011 Works Completed
105 Backwash Water at WTP,s Srinagar Lot-A Kashmir Urban Rangil and Alustang WTP,s 2.42 09 February 2011 06 December 2011 Works Allotted
106 Backwash Water at WTP,s Srinagar Lot-B Kashmir Urban Doodh Ganga WTP 1.84 09 February 2011 06 December 2011 Works Allotted
107 Backwash Water at WTP,s Srinagar Lot-C Kashmir Urban Nishat WTP (11MGD and 8 MGD) 2.78 09 February 2011 06 December 2011 Works Allotted
108 Saki Maidan Kalai Road Lot-1 Jammu Transport 21.7 KM 6.88 12 February 2011 11 February 2012 Works Completed
109 Qazigund-Kulgam Road Lot-1 Kashmir Transport 2 Km 4.06 29 August 2011 31 March 2012 Works Completed