JehangirChowk-SKIMS Road
|
|
Dated: 19 September 2008
|
|
Black Topping near Gol Market
|
|
|
|
The work in progress on Jehangir chowk SKIMMS road near Gol market , in full swing
|
|
|
|
Dated: 19 September 2008
|
|
Large Voids in DBM
|
|
|
|
Large Voids in DBM at 3+700(Wanpoh Chawalgam)
|
|
|
|
Dated: 19 September 2008
|
|
Improper alignment at wanpoh
|
|
|
|
Improper alignment at wanpoh(Wanpoh Chawalgam)
|
|
|
|
Dated: 19 September 2008
|
|
Hard Rocks in Bijbehara langanbal road
|
|
|
|
Hard Rocks in Bijbehara langanbal road
|
|
|
|
Dated: 19 September 2008
|
|
Excavation near camp
|
|
|
|
Excavation near camp in Km Ist(Bijbehara Laganbal)
|
|
|
|
Dated: 19 September 2008
|
|
Drainage blocked
|
|
|
|
Drainage blocked due to shuttering inside at 8+925(Pantha Chowk)
|
|
|
|
Dated: 19 September 2008
|
|
Testing Wanpoh inkm 10+300
|
|
|
|
Collecting BC for testing wanpoh in km 10+300
|
|
|
|
Dated: 19 September 2008
|
|
|
|
|
|
|
|
|
|
Dated: 19 September 2008
|
|
Bijbehara langalbal road.
|
|
|
|
BC in progress on Bijbehara Langalbal Road
|
|
|
|
Dated: 19 September 2008
|
|
BC in progress
|
|
|
|
BC in progress on Bijbehara Laganbal Road
|
|
|