|
Wanpoh-Chawalgam-Aharbal Road
|
Dated: 29 April 2008
|
Work in Progress
|
|
|
|
Dated: 20 April 2008
|
Existing road under construction
|
|
Details later
|
|
Dated: 10 March 2008
|
Slow progress on Foundation
|
|
Slow progress recorded on 10-March-2008, a bridge under execution by JKPCC.
|
|
Dated: 06 December 2007
|
Drain near Tengpora Bridge
|
|
This is the Trunk Drain Section of RawalPora Tengpora Byepass.
|
|
Dated: 11 November 2007
|
Construction of Primary Drain along NH Byepass
|
|
This is the Trunk Drain Section of RawalPora Tengpora Byepass.
|
|
Dated: 12 September 2007
|
Construction of Primary Drain along NH Byepass
|
|
Near RD 2800
|
|
Dated: 05 September 2007
|
Construction of Primary Drain along NH Byepass
|
|
This is the Trunk Drain Section of RawalPora Tengpora Byepass.
|
|
Dated: 15 March 2007
|
Work on Drain in Progress
|
|
Work on Drain in Progress at Gol Gujral and Adjusent areas
|
|
Dated: 12 December 2006
|
Proposed Toilet Blocks for Srinagar and Jammu Citi
|
|
The design are ready for the project
|
|
Dated: 15 March 2006
|
Work on Bridge Started
|
|
Work in Progress by JKPCC
|
|