|
PublicToilets Srinagar
|
Dated: 28 May 2013
|
Public Toilet Block at Batmaloo Bus stand
|
|
Public Toilet Block at Batmaloo Bus stand
|
|
Dated: 28 May 2013
|
Installation of flow meter under Nishat Dalbund W
|
|
Installation of flow meter under Nishat Dalbund Water Supply Scheme
|
|
Dated: 28 May 2013
|
Inauguration of Rawalpora Tengpora Drainage Scheme
|
|
Inauguration of Rawalpora Tengpora Drainage Scheme by Hon’ble Chief Minister
|
|
Dated: 28 May 2013
|
Front view of pump house building of Bemina Fruitm
|
|
Front view of pump house building of Bemina Fruitmandi Drainage Scheme
|
|
Dated: 28 May 2013
|
Air Blower of filter bed at Water Treatment Plant
|
|
Air Blower of filter bed at Water Treatment Plant Pokhribal
|
|
Dated: 28 May 2013
|
Influent well and Flash mixer at Nishat Water Trea
|
|
Influent well and Flash mixer at Nishat Water Treatment Plant
|
|
Dated: 28 May 2013
|
Sedimentation Tank of Zero Discharge at Water Trea
|
|
Sedimentation Tank of Zero Discharge at Water Treatment Plant
Rangil
|
|
Dated: 28 May 2013
|
Installation of air release valve at Rambagh bridg
|
|
Installation of air release valve at Rambagh bridge
|
|
Dated: 28 May 2013
|
Construction of Valve Chamber under Nishat Dalbund
|
|
Construction of Valve Chamber under Nishat Dalbund Water Supply Scheme
|
|
Dated: 28 May 2013
|
Laying of pipe at Rambagh bridge
|
|
Laying of pipe at Rambagh bridge
|
|