Sanitary Landfill Cell-1
|
Dated: 22 February 2010
|
Main Site where Landfill Cells will be constructed
|
|
Site clearance for Landfill Cells in in under progress
|
|
Dated: 08 January 2010
|
Typical Design
|
|
Work in Progress.Contract Monitored, Design parameters as visible
|
|
Dated: 08 January 2010
|
Macadamized road
|
|
Macadamized road and Reinforcement of Bridge.
|
|
Dated: 08 January 2010
|
Black topped road in Section-II.
|
|
Black topped road in Section-II and Retaining wall along road in Tchawalgam Aharbal Section
|
|
Dated: 08 January 2010
|
Black topped road in Section-I.
|
|
Black topped road in Section-I. and Upgraded market road
|
|
Dated: 08 January 2010
|
2-RawalPoraTengpora(P2)8-Jan-2010.jpg
|
|
2-RawalPoraTengpora(P2)8-Jan-2010.jpg and Road restored in SEC-3 in lane 23-25-26.
|
|
Dated: 08 January 2010
|
Perfocated in Manhole cover for water.
|
|
Pefocation in Manhole cover for water percolation. and Reinforcement mesh for bottom plug of sump
|
|
Dated: 08 January 2010
|
Excavation in Main drain
|
|
Excavation in Main drain and Road Restoration by metalling.
|
|
Dated: 08 January 2010
|
Top View of RCC main drain Trapezoidal in section.
|
|
|
|
Dated: 08 January 2010
|
Widening of road
|
|
Widening of road in Tchawalgam Aharbal Section. Retaining wall along road in Tchawalgam Aharbal Section.
|
|