Photo Gallery
J&K ERA Main Logo
Govt. of Jammu and Kashmir
   
PHOTO GALLERY


Sanitary Landfill Cell-1
Dated: 22 February 2010
Main Site where Landfill Cells will be constructed
Site clearance for Landfill Cells in in under progress
 
Dated: 08 January 2010
Typical Design
Work in Progress.Contract Monitored, Design parameters as visible
 
Dated: 08 January 2010
Macadamized road
Macadamized road and Reinforcement of Bridge.
 
Dated: 08 January 2010
Black topped road in Section-II.
Black topped road in Section-II and Retaining wall along road in Tchawalgam Aharbal Section
 
Dated: 08 January 2010
Black topped road in Section-I.
Black topped road in Section-I. and Upgraded market road
 
Dated: 08 January 2010
2-RawalPoraTengpora(P2)8-Jan-2010.jpg
2-RawalPoraTengpora(P2)8-Jan-2010.jpg and Road restored in SEC-3 in lane 23-25-26.
 
Dated: 08 January 2010
Perfocated in Manhole cover for water.
Pefocation in Manhole cover for water percolation. and Reinforcement mesh for bottom plug of sump
 
Dated: 08 January 2010
Excavation in Main drain
Excavation in Main drain and Road Restoration by metalling.
 
Dated: 08 January 2010
Top View of RCC main drain Trapezoidal in section.
 
Dated: 08 January 2010
Widening of road
Widening of road in Tchawalgam Aharbal Section. Retaining wall along road in Tchawalgam Aharbal Section.
 
First Previous Next Last
  Records 111 to 120 of 240