S.
No |
Location |
Discharge
Location |
Rising
Main to be connected / proposed length
in Mtrs. |
|
|
1 |
Sanik Colony, Sec-C |
a) Prop. OHT at Sainik Colony, Sector C (allotted but not started yet)
b) Connected with GLSR at Sainik Colony, PHE
complex |
a) 150 mm dia Rising Main 693m laid & connected with tube well end.
b) 150 / 100 mm dia 1001m pipe line functional
connected with GLSR. |
|
2 |
Sanjay Nagar |
Exist. OHT at Udham Nagar and
Prop. OHT at Sanjay Nagar park |
250mm dia 1587m pipe line interconnection done, connected with existing OHT Udam Nagar |
|
3 |
Adarsh Enclave Trikuta Nagar |
a) Prop. OHT at Adarsh Enclave
(allotted but not started yet)
b) Connected with exist. GLSR |
a) 200mm dia 53m pipe laid, interconnection done with GLSR |
|
4 |
Gangyal (Dashmesh Nagar) |
Prop. OHT at Gangyal
(allotted but not started yet) |
250mm DI ( 190m)
pipe laid. Interconnection with tube well & Distribution system done. |
|
5 |
Deep Nagar |
Prop. OHT at Deep Nagar
(allotted but not started yet) |
100, 150 & 200 mm DI ( 400, 50 & 30m) pipe line laid. Both end
interconnection i.e. pump discharge end & distribution system are to be
done by PHE. |
|
6 |
Apna Vihar |
Distribution system at vicinity |
150 mm DI (729m) pipe line laid
and connected with tube well end. Connection to the distribution system is to
be done by PHE. |
|
|
7 |
Sanik Colony Sec-G |
a) Prop. GLSR at Sainik Colony, Sector G
b) PHE Complex Sanik Colony |
100 mm DI ( 600m)
pipe laid. Interconnection to GLSR Sainik Colony
Sec- F and tube well end is to be done by PHE. |
|
8 |
Rehari Park, Jammu West |
Prop. OHT at Rehari
Allotted but not started |
200 mm DI ( 175m)
pipe line laid and connected with the tube well end. Further connection to
the distribution system is to be done by PHE. |
|
9 |
Kunjwani |
Prop. OHT at Ambica Vihar |
150 mm DI ( 400m)
pipe line laid and connected with tube well end. Connection to the
distribution system is to be done by PHE. |
|
10 |
Jamwal Residency |
GLSR at PHE complex, Channi Himmat |
250 mm dia 2233m pipe laid. |
|
11 |
Balmiki |
OHT in the vicinity (D.C. Block) |
|
|
12 |
Nakrain |
CPS Narwal GLSR |
|
|
13 |
K.C. Colony
(Trikuta Nagar) |
Prop OHT Chak Bijan,K.C.Colony, Preet Nager |
250 mm dia 1255m rising main laid 1140.3m tested interconnection not done .Chakbijan/ Preet Nagar rising
main 3080m laid 3063 tested interconnection not done |
|
14 |
Trikuta Nagar Sector. 5 |
Exist. OHT at Nagawala and Prop. OHT at Nanak Nagar, Sector 10 Not allotted |
300 mm MS (816m) pipe laid |
|
15 |
Nanak Nagar, Sector -8 |
Existing OHT Nanak Ngr School |
Rising Main completed |
|
16 |
Babliana |
OHT in the vicinity |
300 mm MS (500m) Rising Main pipe
line laid |
|
17 |
Procurement Narwal |
Prop. GLSR at Procurement Div. |
Rising main 150 mm 5900m laid |
|
18 |
Digiana
(Roop Nagar) |
Existing OHT near
Ashram |
Rising Main in progress |
|
19 |
Channi Himmat Sec-1A |
Prop. OHT at Channi Himmat |
|
|
20 |
Greater Kailash OHT Premises |
|
|
|
21 |
Dilli |
|
|
|
22 |
Chatta |
|
|
|