30 Tube Wells West Jammu Qty(10)(Lot 3)
10/30 Tube Wells West Jammu (Lot 3)

Loan:

2151-IND
Category: Engineers Design
Location: Jammu Urban Water Supply
Districts Passing:

Constituency Passing:

Status: Works Completed
ERA Ref: UJ/WS/2/01/NCB/07 (Lot-3) Type:Works Mode: LCB
ERA Pac ID: 0071.3
PCSS No: 0071
Scope of Work: 10 Nos
Contract Cost in Rs crore: 4.3508
Dynamic Cost in Rs crore: 6.60
Contractor Details Gurnam Singh and Co.
Date of Signing of Contract 04 January 2008
Date of Start of Work (NTP) 11 January 2008
Completion Period (15 Months)
Completion Date as per Contract 01 April 2009
 
All 10 nos. tube well functional & handed over to PHE namely CPS Muthi, Roop Nagar Stage-II, CPS Muthi Village, CPS Bantalab, Waziron wali gali, Keran, Patoli Bramana, Lower Barnai, Lower Muthi-I & Lakshmi Narayan Mandir, GNR






S. No.

Location

Discharge Location

Rising Main to be connected /  proposed length in Mtrs.

1

CPS - Muthi

Existing OHT / GLSR

M.S. 300 mm dia R/ M laid
(interconnection not done) Ph.-III

2

Roop Nagar Stage-II

Existing OHT / GLSR in vicinity

 

3

CPS - Bantalab

Existing OHT / GLSR in vicinity

 

4

Lower Barnai
(Shamshan Ghat)

Existing OHT / GLSR + Tube Well no. 5

In progress

5

Patoli Bramana
(Near brick Klin)

Proposed GLSR near Brick Klin

 

6

Lower Muthi - I
(Lale-Da-Bagh)

To be finalized

To be surveyed

7

C.P.S. Muthi , Village

Existing OHT / Proposed GLSR in vicinity

To be laid

8

Keran

Existing GLSR at 45m above tube well site

In progress

9

Waziran Gali, Bhori, Talab Tillo

   

10

Lakshmi Narayan Mandir, Gandhi Nagar