BACK |
Construction of 6 Tube Wells Lot-01 |
Construction/Drilling of tube wells, Installation and Commissioning of Mechanical and Electrical Equipment |
Loan:
|
2151-IND |
Category: |
Engineers Design |
Location: |
Jammu Urban Water Supply |
Districts Passing: |
Jammu |
Constituency Passing: |
Jammu |
Status: |
Works Completed |
ERA Ref: |
UJ/WS/2/01A/NCB/09-Lot-1 Type:Works Mode: LCB |
ERA Pac ID: |
0076.1 |
PCSS No: |
0106 |
Scope of Work: |
6 Nos |
Contract Cost in Rs crore: |
4.7079 |
Dynamic Cost in Rs crore: |
4.43 |
Contractor Details |
Hanuman Tube well |
Date of Signing of Contract |
18 January 2010 |
Date of Start of Work (NTP) |
09 February 2010 |
Completion Period |
(12 Months) |
Completion Date as per Contract |
11 February 2011 |
|
|
|
5 Nos Commisioned namely: PHE Complex Dilli, Sainik Colony Sec-D, Greater Kailash, Rudraksh Temple, Roop Nagar
Sdhra Tube Well: Installed new pump set to pump the water of tube well to GLSR at Surinsar road and pump working satisfactorily
|
|
|