Intake Boria Tanks Jammu East (Lot 1)
Design, Construction, Supply, Instalaltion, Testing, Commissioning, Trial Run, Operation & Maintenance of Civil, Mechanical, Electrical Equipment of Intake Pumping Station near Boria Jammu East (Lot 1)
Intake bohria completed by J&K ERA and commissioned on

Loan:

2151-IND
Category: Design as you Built
Location: Jammu Urban Water Supply
Districts Passing:

Constituency Passing:

Status: Works Completed
ERA Ref: UJ/WS/03/04/NCB/07 Type:Works Mode: LCB
ERA Pac ID: 0068.1
PCSS No: 0066
Scope of Work: 1.8 MGD Intake
Contract Cost in Rs crore: 7.15336
Dynamic Cost in Rs crore: 7.43
Contractor Details SMS Paryavaran
Date of Signing of Contract 19 December 2007
Date of Start of Work (NTP) 01 January 2008
Completion Period (18 Months)
Completion Date as per Contract 01 July 2009
 
All 16 nos river piles completed All 10 nos. shore piles completed Pipe : MS pipe 400mm dia laid 60m
Pump Room : Pump commissioned, concreting of roof slab done upto 321m level Beam: Concreting of beam at SP1, SP2, SP3, SP4, SP7 & SP8 completed upto 315m level. TB1 & TB6 concreting done at 310m level. Concreting of beams
5 nos. of DG room at 317.50m level completed. Concreting of 9 nos. beam of DG room / parking (half) completed. Concreting of 3 nos. beam at 310m level from pile cap to column completed, Reinforcement of 1 nos beam in progress
Column: Concreting of column at SP1, SP2, SP3, SPC7, SPC8 completed upto 315m level. concreting at C3, C6, C2 & C5 done upto 317.4m level, concreting of C7 done upto 317.50m level. Reinforcement of column upto 320.30m level of DG room completed. concreting of 2 nos column from 310 to 314m level completed for parking area
Bridge: Steel bridge completed, concreting of walkway slab completed at 315m level. Slab: Concreting of roof slab of DG room & half parking floor slab completed at 320.30m level Brick Work: DG room, Parking & pump room in progress Bracing between river pile: Bracing work at 303m, 306m level completed, 300m 309m & 315m level is in progress, Grating for pump protection in progress. Concreting of retaining wall (half portion) completed.
Bridge: Steel bridge completed, concreting of walkway slab completed at 315m level. Slab: Concreting of roof slab of DG room & half parking floor slab completed at 320.30m level
Brick Work: DG room completed, Parking, office room & pump room in progress Bracing between river pile: Bracing work at 303m, 306m, 309m level completed, 309m & 315m level is in progress, Grating for pump protection in progress. Concreting of retaining wall (half portion) completed
Finishing work: Plastering below floor slab, DG room & Walkway bridge completed, roof slab of DG room and pump house in progress
Sr

Sr. No.

Description of work

1

Intake structure pile work

2

Intake structure pile work

3

Intake structure pile work

4

Intake structure pile work (Shore)

5

Intake structure pile work

6

Intake structure pile work

7

Intake structure pile work (Shore)

8

Intake structure pile work

9

Intake structure pile work