Rawalpora Chowk to Chanpora Bridge Drainage Scheme
Storm water drainage system in RawalporaChowk to Channapora Bridge catchment areas at NH bypass Srinagar
Vertical Turbine Pumps (Zone -I)

Loan:

3132-IND
Category: Engineers Design
Location: Kashmir Urban Drainage
Districts Passing:

Constituency Passing:

Status: Works Completed
ERA Ref: JKUSDIP Srinagar/SWD/02 Type:Works Mode: NCB
ERA Pac ID: RChan
PCSS No: 0001-04
Scope of Work:
Contract Cost in Rs crore: 107.0075
Dynamic Cost in Rs crore: 164.95
Contractor Details Hassan Const Company
Date of Signing of Contract 31 May 2014
Date of Start of Work (NTP) 09 June 2014
Completion Period (30 Months)
Completion Date as per Contract 05 December 2016
 
41 kms drainage Network constructed in Srinagar City
35 km road reconstructed/restored with macademisation
3 Dewatering stations constructed