    | TR Leh G4-Lot-01Bituminisation (Leh Main, Shenam-Sheldon, Upper Tuckcha-Changespa)  | 
  
  
    | Providing and Laying of Bituminous Course to Road Along Main Leh Nallah, Shenam-Sheldon Road , Lamdon Labook Road Upper Tuckcha-Changespa | 
  
  
    
  
  
    
      
        
          
            Loan:
              
              | 
            2151-IND | 
           
          
            | Category: | 
            Engineers Design | 
           
          
            | Location: | 
            Kashmir Transport Roads | 
           
          
            | Districts Passing:  | 
             | 
           
          
            Constituency Passing:  | 
             | 
           
          
            | Status: | 
            Works Completed | 
           
          
            | ERA Ref: | 
            Transport /Srinagar/Road/34 Type:Works Mode: LCB | 
           
          
            | ERA Pac ID: | 
            0073.7 | 
           
          
            | PCSS No: | 
            0109 | 
           
          
            | Scope of Work: | 
            10.56 KM  | 
           
          
            | Contract Cost in Rs crore: | 
            2.4289 | 
           
          
            | Dynamic  Cost in Rs crore: | 
            2.43 | 
           
          
            | Contractor Details | 
            G.C Dorjey Construction | 
           
          
            
           
            | Date of Signing of Contract  | 
            23 January 2010 | 
           
          
            | Date of Start of Work (NTP)  | 
            23 January 2010 | 
           
          
            | Completion Period | 
            (12 Months) | 
           
          
            | Completion Date as per Contract  | 
            23 January 2011 | 
           
            | 
       
      | 
  
  
    |   | 
  
  
    
	Project completed and handed over to PWD (R&B) Deptt Leh  
	  
       
	   
	  
      
      
	  | 
  
  
     | 
  
  
    |   |