GO
BACK |
Town Roads Leh G3-Lot-01 (Urbis Bridge) |
Urbis Bridge in Leh (Contract terminated on 18-1-2013) Scope= 55 m Revised =71.45 m |
Loan:
|
2151-IND |
Category: |
Engineers Design |
Location: |
Kashmir Transport Bridges |
Districts Passing: |
|
Constituency Passing: |
|
Status: |
Contracts Terminated |
ERA Ref: |
Type:Works Mode: LCB |
ERA Pac ID: |
0073.6 |
PCSS No: |
0095 |
Scope of Work: |
71045 Mtr Span |
Contract Cost in Rs crore: |
3.03 |
Dynamic Cost in Rs crore: |
3.57 |
Contractor Details |
Granco Industries |
Date of Signing of Contract |
04 December 2008 |
Date of Start of Work (NTP) |
02 January 2009 |
Completion Period |
(12 Months) |
Completion Date as per Contract |
31 December 2009 |
|
|
|
Project handed over to JKPCC
|
Contract terminated on 18-01-2013 due to non-performance of the contractor and handed over to JKPCC for execution of Balance work |
|